PORTUGUESE

Studies

PPP Viability Studies (Portuguese)

NOTICE: "The traffic and engineering studies for BR-116/324 (BA) covered a 35-year period, which is the maximum term allowed by Law 11079/2004 for a PPP contract. Based on the feasibility study and options analysis, a variable contract term of between 13 and 17 years was deemed to be the most appropriate. Nevertheless, the technical studies still disclose the information related to years 18 to 35."